Skip to main content

New tunnel link for Rio de Janeiro

Excavation work is now underway in Brazil for the Transolimpica tunnel. The US$688.6 million project forms part of the preparation works for the 2016 Olympic Games. The 23km route will connect Barra da Tijuca and Deodoro in Rio de Janeiro. The construction work is expected to last 18 months and should be complete by December 2015. Work on the Transolimpica route is being carried out by the Viario consortium, which comprises Odebrecht, Invepar, and CCR. The tunnel will feature two lanes in each direction whe
November 15, 2013 Read time: 1 min
RSSExcavation work is now underway in Brazil for the Transolimpica tunnel. The US$688.6 million project forms part of the preparation works for the 2016 1558 Olympic Games. The 23km route will connect Barra da Tijuca and Deodoro in Rio de Janeiro. The construction work is expected to last 18 months and should be complete by December 2015. Work on the Transolimpica route is being carried out by the Viario consortium, which comprises 1305 Odebrecht, Invepar, and CCR. The tunnel will feature two lanes in each direction when it is complete and expected to handle some 55,000 vehicles/day. The project also includes the construction of a BRT lane with 18 stations and two passenger terminals, which is expected to serve some 100,000 passengers and cut travel time by two hours.

For more information on companies in this article

Related Content

  • Technology helps earth moving and paving
    August 18, 2014
    Located in Meeker, Colorado and serving the area for air transportation is Meeker Airport, a C-II general aviation airport. The FAA designation of C-II means the airport can accommodate aircraft with wingspan of less than 24m. Runway 3-21 at the Rio Blanco county-owned Meeker Airport had reached a point of wear and deterioration that required full reconstruction and upgrades to remain compliant with the FAA’s C-II requirements.
  • More studies for the Great Istanbul Tunnel under the Bosporus
    March 11, 2019
    Work has started on a geological condition field study for a proposed 6.5km three-deck road and rail tunnel under the Bosporus Strait in Istanbul, Turkey. Average daily road traffic through the Great Istanbul Tunnel is expected to be 120,000 vehicles and the rail line will move around 75,000 people daily. The tunnel, announced in 2015, will be nearly 19m in diameter and have two road levels and one rail level. It will run between Gayrettepe on the European side and Küçüksu on the Asian side. The ci
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Hyundai E&C is working on Turkey’s new third Bosporus Bridge
    July 10, 2013
    Hyundai Engineering & Construction (Hyundai E&C) is to head a consortium building the lateral towers, aprons and suspension cables for the new Bosporus crossing in Turkey. Hyundai E&C will work in a consortium with its partner SK Engineering & Construction on the US$697 million project to construct the 2.16km Third Bosporus Bridge. This suspension bridge will feature eight lanes for motor vehicle traffic as well as two rail lines. With a width of 59m it will be the widest bridge in the world that carries a