Skip to main content

Hyundai E&C is working on Turkey’s new third Bosporus Bridge

Hyundai Engineering & Construction (Hyundai E&C) is to head a consortium building the lateral towers, aprons and suspension cables for the new Bosporus crossing in Turkey. Hyundai E&C will work in a consortium with its partner SK Engineering & Construction on the US$697 million project to construct the 2.16km Third Bosporus Bridge. This suspension bridge will feature eight lanes for motor vehicle traffic as well as two rail lines. With a width of 59m it will be the widest bridge in the world that carries a
July 10, 2013 Read time: 2 mins
5739 Hyundai Engineering & Construction (236 Hyundai E&C) is to head a consortium building the lateral towers, aprons and suspension cables for the new Bosporus crossing in Turkey. Hyundai E&C will work in a consortium with its partner SK Engineering & Construction on the US$697 million project to construct the 2.16km Third Bosporus Bridge. This suspension bridge will feature eight lanes for motor vehicle traffic as well as two rail lines. With a width of 59m it will be the widest bridge in the world that carries a rail line while its 322m high towers will be the world’s tallest. The bridge is due for completion by 2016. Hyundai E&C has a 60% stake in the project worth some $418 million while the remainder is held by while its partner, SK Engineering & Construction. The bridge is strategically important as it connects Asia and Europe.

Istanbul’s third Bosporus bridge forms part of the north Marmara highway project’s Odayeri-Paşaköy section. The tender was awarded to a consortium comprising Turkish company IC İçtaş and Italian firm Astaldi.

The new bridge will be built to the north of the two existing structures and will connect Garipçe district on the European side with Poyrazköy district on the Asian side. When the new bridge is complete it will carry all trucks and heavy-duty vehicles. The two existing bridges over the Bosporus have a combined capacity of 250,000 vehicles/day but generally carry some 600,000 vehicles/day.

Both Hyundai E&C and SK Engineering & Construction are headquartered in South Korea. Hyundai E&C has carried out a series of major transport projects around the world including the Gyeongbu Expressway, Machang Grand Bridge, the Penang Bridge Packages 3,4 and 5  and the Jamuna Multipurpose Bridge. Currently, it is in charge of many distinctive overseas projects such as Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project and 3352 Lusail Expressway Package 1.

For more information on companies in this article

Related Content

  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Plans moving forward for key Turkish highway
    October 11, 2013
    Plans are moving forward in Turkey for the construction of a new highway project. Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
  • VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders
    May 23, 2016
    Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

    The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.