Skip to main content

New Slovakia highway under construction

A section of Slovakia’s D3 highway between Skalite and Svrcinovec should be complete by May 2017. This stretch of the D3 highway is in the north of Slovakia and will improve transport links to the neighbouring countries of the Czech Republic and Poland. The section of highway was previously expected to be complete during 2016 but a series of delays have been caused by various geological issues. The topography of the area is challenging and the section will include two tunnels and over 20 bridges as a result
October 3, 2016 Read time: 1 min
A section of Slovakia’s D3 highway between Skalite and Svrcinovec should be complete by May 2017. This stretch of the D3 highway is in the north of Slovakia and will improve transport links to the neighbouring countries of the Czech Republic and Poland. The section of highway was previously expected to be complete during 2016 but a series of delays have been caused by various geological issues. The topography of the area is challenging and the section will include two tunnels and over 20 bridges as a result.

Related Content

  • Slovakia highway opening faces delays
    March 2, 2017
    A key stretch of the D3 highway in Slovakia will open in the third quarter of 2017. This timescale represents a delay however as the section of road was originally planned to open in the second quarter of 2017. The 4.25km section runs from Zilina Strazov to Zilina Brodno and is costing close to €306 million to construct, with most of the funding being supplied by EU sources. This stretch of the highway is both complex and challenging as it includes a 2.2km section of tunnel as well as bridge over the the Hr
  • TensarTech supports Polish contract
    November 12, 2012
    TensarTech soil retaining walls have been used during the construction of a section of the A1 motorway in Poland. Extensive underground mining in the south of the country posed a significant challenge to building the 16km Piekary Slaskie to Pyrzowice (Katowice Airport) stretch of the motorway which, on completion, will run more than 240km from Gdansk in northern Poland to Gorzyczki on the Polish-Czech Republic border. To accommodate potential differences in settlement on embankments approaching a series of
  • Czech road project awards and tender
    July 19, 2024
    Czech road projects have been awarded, with another due to open for tender.
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi