Skip to main content

New SF-Oakland Bay Bridge over budget and overdue

The project to replace the San Francisco-Oakland Bay Bridge is taking too long and is going over budget, according to California state officials. The officials claim US$1.28 billion had been spent for the replacement of the damaged eastern span by 2004, with the cost continue going up. A projected $20 million repair was announced on 10 July 2013 after the failure of 32 steel rods in stress tests. The 3.54km structure has yet to be completed after nearly 10 years. Cost projection has increased to roughly $6.
July 22, 2013 Read time: 1 min
The project to replace the San Francisco-Oakland Bay Bridge is taking too long and is going over budget, according to California state officials. The officials claim US$1.28 billion had been spent for the replacement of the damaged eastern span by 2004, with the cost continue going up.

A projected $20 million repair was announced on 10 July 2013 after the failure of 32 steel rods in stress tests. The 3.54km structure has yet to be completed after nearly 10 years. Cost projection has increased to roughly $6.4 billion. The bridge had fallen in the Loma Prieta earthquake in 1989.

Related Content

  • Just stop arguing and build the thing
    December 15, 2017
    The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate. The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy. Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeologi
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • California bridge receiving constant attention
    May 29, 2012
    The MISTRAS Group is handling a US$3.4 million contract for continuous structural health monitoring on the San Francisco Oakland Bay Bridge. The client for this contract is the California Department of Transportation (CALTRANS) and MISTRAS will be responsible for installing and operating the package. The system is being installed on the bridge in response to a fatigue defect found on a structural steel beam in a regularly scheduled inspection during a holiday closure in 2009.
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as