Skip to main content

New SF-Oakland Bay Bridge over budget and overdue

The project to replace the San Francisco-Oakland Bay Bridge is taking too long and is going over budget, according to California state officials. The officials claim US$1.28 billion had been spent for the replacement of the damaged eastern span by 2004, with the cost continue going up. A projected $20 million repair was announced on 10 July 2013 after the failure of 32 steel rods in stress tests. The 3.54km structure has yet to be completed after nearly 10 years. Cost projection has increased to roughly $6.
July 22, 2013 Read time: 1 min
The project to replace the San Francisco-Oakland Bay Bridge is taking too long and is going over budget, according to California state officials. The officials claim US$1.28 billion had been spent for the replacement of the damaged eastern span by 2004, with the cost continue going up.

A projected $20 million repair was announced on 10 July 2013 after the failure of 32 steel rods in stress tests. The 3.54km structure has yet to be completed after nearly 10 years. Cost projection has increased to roughly $6.4 billion. The bridge had fallen in the Loma Prieta earthquake in 1989.

Related Content

  • Demolition starts for Gerald Desmond Bridge
    July 14, 2022
    The 125m-long span will be dismantled, cut and lowered onto a barge in the waters around the Port of Long Beach in the US state of California.
  • ARTBA sees growth for US transport construction
    December 5, 2017
    Steady growth in the US market for transport infrastructure construction in 2018. This prediction comes from a new report by the American Road & Transportation Builders Association (ARTBA). The report suggests that the US transportation infrastructure market will rebound slightly next year, following a 2.8% drop in 2017.
  • Electronic tolling to be introduced for California bridges?
    December 6, 2018
    California’s Bay Area Toll Authority is evaluating the potential for introducing electronic tolling technology on key bridge links in the state. The proposals would see electronic tolling systems being introduced for the seven state-owned toll bridges in the San Francisco Bay Area. Should the proposal go ahead, it would cost an estimated US$50 million to install the systems on the seven crossings. A decision is expected in early 2019 and if the go-ahead is given, the systems would be made operational durin
  • California uses stimulus funds
    February 23, 2012
    The US state of California has been able to take advantage of federal stimulus funds to help improve its transport infrastructure.