Skip to main content

New Russian bridge project to span Samara River

Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.
October 21, 2014 Read time: 1 min
Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.

Related Content

  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • New Russian highway works
    October 26, 2021
    New Russian highway projects are commencing
  • Russian road projects delayed by funding shortage
    February 9, 2016
    In Russia a series of road projects planned to improve connections to Moscow’s Domodedovo Airport have been cut. The new roads connecting to Domodedovo Airport are required for the 2018 FIFA World Cup. But with Russia cutting its federal budget for road development, the projects have halted. Projects affected include the reconstruction of five sections of the A105 federal highway to the airport, construction of four interchanges and nine pedestrian overpasses. The work was expected to cost a total of US$206
  • Major Russian bridge projects underway
    December 13, 2017
    A series of major bridge projects are underway in Russia, in the Krasnodar Region, Novosibirsk and the Surgut District. A new bridge being built in the Krasnodar Region is expected to be open to vehicle traffic at the end of 2018. Work on the bridge supports is being completed at present and work on the deck is now underway. The bridge will also carry rail traffic from the end of 2019. Meanwhile in Novosibirsk, construction is commencing on a new bridge spanning the Ob River. This will be the fourth bridge