Skip to main content

New Russian bridge project planned

A new bridge is planned for Russia, which will span the Sheksna River in Cherepovets. The bridge will measure 1.13km in length and the project also involves building 7km of connecting roads. The bridge will be built in Russia’s Vologda Region and the work has a pricetag of nearly US$248 million. Because of the river traffic, the bridge will have to be built high enough to allow a clear passage for vessels underneath. Construction work will commence during 2019 and is expected to take until to 2025 to comple
March 29, 2019 Read time: 1 min

A new bridge is planned for Russia, which will span the Sheksna River in Cherepovets. The bridge will measure 1.13km in length and the project also involves building 7km of connecting roads. The bridge will be built in Russia’s Vologda Region and the work has a pricetag of nearly US$248 million. Because of the river traffic, the bridge will have to be built high enough to allow a clear passage for vessels underneath. Construction work will commence during 2019 and is expected to take until to 2025 to complete.

Related Content

  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Russian road and bridge deal
    April 17, 2019
    A new bypass and bridge project for Tolyatti will commence in Russia’s Samara region. The bridge will span the Volga River and the work is costing US$462.4 million. The funds will be allocated in three stages. The first tranche will be received in 2019, while the second and third will be transferred in 2020 and 2021 respectively. The 97km road project includes the 3.75km bridge link, with opening due in 2024.
  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • Project building new Biobio bridge in Chile on track
    August 28, 2014
    Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. T