Skip to main content

New Polish motorway opens to traffic

A new section of Poland’s important A1 motorway project is now open to traffic. The 33km stretch connects Pyrzowice with Czestochowa in southern Poland. This forms part of a project to build a 58km section of the A1 route, with an expected cost of €696 million. Improving transport connections with Pyrzowice is important for southern Poland as the town is the location of the airport serving the nearby industrial city of Katowice, as well as Czestochowa. The A1 motorway connects the port of Gdansk in Poland’
August 7, 2019 Read time: 1 min

A new section of Poland’s important A1 motorway project is now open to traffic. The 33km stretch connects Pyrzowice with Czestochowa in southern Poland. This forms part of a project to build a 58km section of the A1 route, with an expected cost of €696 million. Improving transport connections with Pyrzowice is important for southern Poland as the town is the location of the airport serving the nearby industrial city of Katowice, as well as Czestochowa.

The A1 motorway connects the port of Gdansk in Poland’s north with Katowice in the south and also links with the Czech border close to Ostrava.

Related Content

  • Bihar crossing for Ganges River
    November 16, 2016
    A loan facility from the Asian Development Bank (ADB) will help fund work on the project to construct a new bridge over the River Ganges in India’s Bihar State. Because of the width of the river at this point, the bridge will be close to 10km in length, making it the longest in India. The new bridge will improve transport connections between the north and south of the state and the project is expected to cost around US$500 million. Building the bridge will help develop transport and trade in the area, as we
  • A1 Upgrade section opens in the UK
    March 27, 2019
    A key section of the UK’s important A1 route is now open to traffic.
  • Poland: Intercor wins S3 dual carriageway contract
    April 2, 2015
    Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
  • Czech Republic cuts road spending
    May 14, 2012
    News that the Czech Republic’s Transport Ministry will halt work to just four road building projects has come as a relief to several major contractors. The industry had feared much tougher budget savings would be imposed, resulting in road projects in double figures being suspended or cancelled. The projects being halted will be a section of the I/9 road near Ceska Lipa; the Ostrava-Opava stretch of the I/11 road and two connections to the D1 highway in the Ostrava region.