Skip to main content

New Polish expressway project planned

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.
November 11, 2019 Read time: 1 min

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.

Related Content

  • Polish capital route project being planned
    September 9, 2019
    Route reviews are being carried out for a key Polish project. Poland’s highways authority, GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.
  • Poland: Intercor wins S3 dual carriageway contract
    April 2, 2015
    Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
  • Major Romanian road projects are underway
    January 23, 2023
    Many major Romanian road projects are currently underway.
  • Strabag closes in on Poland’s S8 Marki-Kobylka contract
    August 19, 2019
    Strabag has nudged into the lead for Poland’s retender of the dual lane S8 section between the Marki and Kobylka junctions, previously held by Salini-Impreglio. Five offers were on the table for the deal with Strabag offering €38 million, well above the €32 million that was budgeted for by GDDKiA, Poland’s road authority. Other bids came from a consortium headed by Warszawskie Przedsiebiorstwo Mostowe Mosty at nearly €40 million, a PORR and Unibep consortium offere at almost €59 million, a bid by I