Skip to main content

New Polish expressway project planned

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.
November 11, 2019 Read time: 1 min

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.

Related Content

  • Polish project planned
    July 29, 2020
    A key Polish dual carriageway project is being planned.
  • New crossing planned for Kerch Strait
    June 10, 2014
    Plans for a new crossing for the Kerch Strait are now moving forward. The Russian roads company Avtodor is in charge of the project, which calls for the building of both road and rail connections. As series of options are being considered and in all the work is expected to cost in the region of US$8.2-$10.9 billion. There are eight options being investigated at present, with five looking at bridges to carry both road and rail and a further three for combined connections with bridges for the roads and tunnel
  • Russian roads and bridges being planned
    April 22, 2020
    Russian road and bridge construction and maintenance works are being planned.
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan