Skip to main content

New Panama Canal bridge crossing

Work is now complete the Panama Canal third bridge project. Costing US$590 million, the bridge features two lanes in either direction. Called the Atlantico Bridge, construction started on the link in early 2013. The new link will help reduce journey times for commuters as well as helping Panama’s tourist trade.
August 7, 2019 Read time: 1 min

Work is now complete for the Panama Canal third bridge project. Costing US$590 million, the bridge features two lanes in either direction and has a 530m central span. These dimensions make the bridge the longest span four lane, cable-stayed structure in the world. Called the Atlantic Bridge, construction started on the link in early 2013. The new link will help reduce journey times for commuters as well as helping Panama’s tourist trade. Design work for the project was carried out jointly by the China Communication Construction Company and Louis Berger Group (WSP Global).

Related Content

  • Myanmar bridge construction project underway
    February 18, 2019
    Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help
  • Flatiron and Dragados win Corpus Christi Bridge deal
    June 25, 2015
    The Texas Transportation Commission has conditionally awarded the two companies, Flatiron and Dragados the contract to design, build and operate a new cable stayed Corpus Christi Harbor Bridge.
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch