Skip to main content

New motorway link for Hungary will be delayed

In Hungary the national infrastructure development company, NIF, says that a new stretch of the M0 orbital between the number 1 road and the number 10 road will not to be constructed before 2020. An environmental permit for the project is expected to be granted in the second half of 2016. The new stretch will feature two lanes in both directions and will be 18km long. A budget for the project has yet to be announced.
July 3, 2014 Read time: 1 min
In Hungary the national infrastructure development company, NIF, says that a new stretch of the M0 orbital between the number 1 road and the number 10 road will not to be constructed before 2020. An environmental permit for the project is expected to be granted in the second half of 2016. The new stretch will feature two lanes in both directions and will be 18km long. A budget for the project has yet to be announced.

Related Content

  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.
  • Over US$380mn for Hungary road repairs in 2013
    June 11, 2013
    Around US$388.39 million (HUF 87bn) will be spent on road repairs in Hungary during 2013, according to State Secretary of the Hungarian Ministry of National Development (NFM) Sara Hegmanne Nemes. As a result, country roads with a total length of some 600kms will be repaired. The project will be financed from EU funds in line with the country's New Szechenyi Plan (USZT). In Jasz-Nagykun-Szolnok county, some 28.4kms of road will be renovated from $14.11 million (HUF 3.18bn). This includes the upgrade of a 5.4
  • Tender process underway for Polish road projects
    August 18, 2014
    The tender process is underway for two major projects in Poland. One project involves constructing three sections of the new southern ring road around Polish capital Warsaw. Building the 18.5km stretch that comprises the three sections is expected to cost in the region of €1.6 billion. The Polish General Directorate for National Roads and Motorways (GDDKiA) says that bids have to be submitted by 10th October 2014. The A section will be some 4.6km long, the B section 6.45km long, whilst the C section will be
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of