Skip to main content

New Hong Kong road tunnel planned

In Hong Kong plans are moving forward with regard to the construction of the new Lam Tin Tunnel. The tunnel will be around 2.6km long and form the major stretch of a new 4.2km road link connecting Lam Tin with Tseung Kwan O South. The Tseung Kwan O to Lam Tin Tunnel project also includes the construction of a number of interchanges, pedestrian walkways and cycle lanes. A key segment of the work is the construction of a 1.2km single one-lane slip road partly in the form of tunnel connecting Tseung Kwan O and
June 5, 2014 Read time: 2 mins
In Hong Kong plans are moving forward with regard to the construction of the new Lam Tin Tunnel. The tunnel will be around 2.6km long and form the major stretch of a new 4.2km road link connecting Lam Tin with Tseung Kwan O South. The Tseung Kwan O to Lam Tin Tunnel project also includes the construction of a number of interchanges, pedestrian walkways and cycle lanes. A key segment of the work is the construction of a 1.2km single one-lane slip road partly in the form of tunnel connecting Tseung Kwan O and Eastern Harbour Crossing. Another important aspect is the construction of the 400m long dual two-lane Cha Kwo Ling Tunnel between the proposed Lam Tin Interchange and Trunk Road T2. The P2 Road will be an 800m long, dual two-lane highway (Road P2), with some 600m of the link in a cutting and the remaining 200m covered by landscaped deck. The new Lam Tin Interchange and Tseung Kwan O Interchange will connect the new road and tunnel link to the existing road network. Ancillary works for the project include a number of footbridges, pedestrian crossings, cycle lanes, parking areas and modifications to the existing seawall. Neither the estimated cost of the work nor the work schedule, have so far been released.

Related Content

  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • New design for Sydney’s WestConnex motorway project third stage
    November 14, 2016
    Sydney’s proposed WestConnex motorway will be wider than planned to accommodate four instead of three lanes in each direction, according to media reports. The changes are part of a revamp of the third and final stage of the ambitious project in the capital city of Australia’s eastern New South Wales state. Some exit and entry ramps will also be scrapped but the overall cost of just under US$5.3 billion for the third stage remains unchanged, reported the Sydney Morning Herald newspaper. The projects
  • Smart road test facility in Virginia
    July 28, 2015
    A test stretch of road in the US is playing a valuable role in developing technology and boosting traffic safety -*Tom Gibson writes Located a short distance from the Virginia Tech campus in the mountains of rural southwest Virginia in the mid-Atlantic region of United States, the Virginia Smart Road looks like a conventional road. But venturing to either end of the 3.5km-long thoroughfare reveals that it actually goes nowhere, at least for now. The result of a plan conceived back in the 1980s, the Vi