Skip to main content

New highway linking Serbia with Albania through Kosovo planned

Plans are now being worked on for a new highway that will connect Serbia with Albania, running through Kosovo. The project is momentous and marks a considerable diplomatic advance, given that Serbia’s past relations with its neighbour Kosovo and Albania have been less than harmonious in the recent past. This new move is seeing a Technical Working Group comprised of experts from Albania and Serbia looking into the construction of a new highway link between the two countries, as well as new railway connection
February 25, 2015 Read time: 1 min
Plans are now being worked on for a new highway that will connect Serbia with Albania, running through Kosovo. The project is momentous and marks a considerable diplomatic advance, given that Serbia’s past relations with its neighbour Kosovo and Albania have been less than harmonious in the recent past. This new move is seeing a Technical Working Group comprised of experts from Albania and Serbia looking into the construction of a new highway link between the two countries, as well as new railway connections. This group will present two projects to the 2465 European Commission in May 2015. The talks between the two countries will focus on construction of the Nis-Pristina-Tirana highway, and reconstruction and an upgrade of the Belgrade-Bar railway line. The total cost of the two projects is estimated at around €2 billion.

The highway connection between Kosovan capital Pristina and the Albanian border was constructed by joint venture partners 4138 Bechtel 5252 Enka. This new highway connection will run from Pristina to the Kosovo/Serbian border, completing the link from Serbia to Albania’s capital Tirana.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2425 0 oLinkInternal visit this page Kosovo's award-winning green highway construction false /sections/key-projects/features/kosovos-award-winning-green-highway-construction/ false false%>.

For more information on companies in this article

Related Content

  • Delay to SF-Oakland Bay Bridge East Span opening and probe report
    July 9, 2013
    The Toll Bridge Program Oversight Committee (TBPOC) today said that the previously scheduled Labor Day (2 Sep) opening of the new East Span of the San Francisco-Oakland Bay Bridge has been postponed. News of the delayed opening was announced at the same time as TBPOC released its investigative report into the 32 bolts that broke on the Bay Bridge in March 2013, and its review of other bolts on the bridge. The contractor now forecasts that the steel saddle retrofit of the failed bolts on the east pier will b
  • Doosan updates short-radius 14tonner
    January 6, 2017
    Doosan Construction Equipment has launched a Dash-3 version of its popular reduced-radius 15tonne excavator, the DX140LCR-3. Powered by a Cummins QSB4.5 Stage IIIB-compliant engine, with exhaust gas recirculation (EGR) and a diesel particulate filter (DPF), the machine has 10% more power and 15% more torque than the previous model. Both main boom and dipper arm forces get an 8% boost, while travel speeds are increased to 5.3km/h, resulting in a claimed a 10% increase in productivity.
  • Doosan updates short-radius 14tonner
    April 16, 2013
    Doosan Construction Equipment has launched a Dash-3 version of its popular reduced-radius 15tonne excavator, the DX140LCR-3. Powered by a Cummins QSB4.5 Stage IIIB-compliant engine, with exhaust gas recirculation (EGR) and a diesel particulate filter (DPF), the machine has 10% more power and 15% more torque than the previous model. Both main boom and dipper arm forces get an 8% boost, while travel speeds are increased to 5.3km/h, resulting in a claimed a 10% increase in productivity.
  • Double delight for Powerscreen and DUO in Ghana
    January 6, 2017
    Powerscreen has signed DUO Africa as its first distributor in Ghana. And, as the ink dried on the contract at bauma, the company unveiled a deal to supply three crushing and screening trains. DUO Africa will sell equipment into Ghana and support Powerscreen products in the sub-Saharan region. Among its first contracts is to supply two Powerscreen XA400 primary jaw crushers, two 1000 Maxtrak cone crushers and two Chieftain 2100 triple-deck screens to UK-based Hawk Plant for a number of aggregate crushing ope