Skip to main content

New highway linking Serbia with Albania through Kosovo planned

Plans are now being worked on for a new highway that will connect Serbia with Albania, running through Kosovo. The project is momentous and marks a considerable diplomatic advance, given that Serbia’s past relations with its neighbour Kosovo and Albania have been less than harmonious in the recent past. This new move is seeing a Technical Working Group comprised of experts from Albania and Serbia looking into the construction of a new highway link between the two countries, as well as new railway connection
February 25, 2015 Read time: 1 min
Plans are now being worked on for a new highway that will connect Serbia with Albania, running through Kosovo. The project is momentous and marks a considerable diplomatic advance, given that Serbia’s past relations with its neighbour Kosovo and Albania have been less than harmonious in the recent past. This new move is seeing a Technical Working Group comprised of experts from Albania and Serbia looking into the construction of a new highway link between the two countries, as well as new railway connections. This group will present two projects to the 2465 European Commission in May 2015. The talks between the two countries will focus on construction of the Nis-Pristina-Tirana highway, and reconstruction and an upgrade of the Belgrade-Bar railway line. The total cost of the two projects is estimated at around €2 billion.

The highway connection between Kosovan capital Pristina and the Albanian border was constructed by joint venture partners 4138 Bechtel 5252 Enka. This new highway connection will run from Pristina to the Kosovo/Serbian border, completing the link from Serbia to Albania’s capital Tirana.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2425 0 oLinkInternal visit this page Kosovo's award-winning green highway construction false /sections/key-projects/features/kosovos-award-winning-green-highway-construction/ false false%>.

For more information on companies in this article

Related Content

  • Double delight for Powerscreen and DUO in Ghana
    April 16, 2013
    Powerscreen has signed DUO Africa as its first distributor in Ghana. And, as the ink dried on the contract at bauma, the company unveiled a deal to supply three crushing and screening trains. DUO Africa will sell equipment into Ghana and support Powerscreen products in the sub-Saharan region. Among its first contracts is to supply two Powerscreen XA400 primary jaw crushers, two 1000 Maxtrak cone crushers and two Chieftain 2100 triple-deck screens to UK-based Hawk Plant for a number of aggregate crushing ope
  • Liugong gets tough
    January 6, 2017
    LiuGong is providing construction machines for use in a particularly tough application that will see them endure ferocious weather conditions. The company is donating two machines to the Polar Research Institute of China (PRIC). This will be the first time LiuGong equipment has entered the most rugged environment in the world. The 920D excavator and 856 wheeled loader are being shipped with the PRIC scientific team to the South Pole. Two LiuGong technical experts will go with the machines after attending se
  • Liugong gets tough
    November 23, 2012
    LiuGong is providing construction machines for use in a particularly tough application that will see them endure ferocious weather conditions. The company is donating two machines to the Polar Research Institute of China (PRIC). This will be the first time LiuGong equipment has entered the most rugged environment in the world. The 920D excavator and 856 wheeled loader are being shipped with the PRIC scientific team to the South Pole. Two LiuGong technical experts will go with the machines after attending se
  • Groeneveld shows off its new Twin-3 XL dual-line heavy duty automatic greasing system
    January 6, 2017
    Groeneveld has two new products on show at Bauma, a Twin-3 XL dual-line heavy duty automatic greasing system featuring a 20kg reservoir for larger machines, and a new heavy duty Oilmaster unit for construction and earthmoving equipment that uses an electronically-controlled oil management system. The latest Groeneveld Twin-3 XL features an extra-large 20 kilos grease reservoir made from solid coated metal.