Skip to main content

New crossing planned for Kerch Strait

Plans for a new crossing for the Kerch Strait are now moving forward. The Russian roads company Avtodor is in charge of the project, which calls for the building of both road and rail connections. As series of options are being considered and in all the work is expected to cost in the region of US$8.2-$10.9 billion. There are eight options being investigated at present, with five looking at bridges to carry both road and rail and a further three for combined connections with bridges for the roads and tunnel
June 10, 2014 Read time: 2 mins
Plans for a new crossing for the Kerch Strait are now moving forward. The Russian roads company 3974 Avtodor is in charge of the project, which calls for the building of both road and rail connections. As series of options are being considered and in all the work is expected to cost in the region of US$8.2-$10.9 billion. There are eight options being investigated at present, with five looking at bridges to carry both road and rail and a further three for combined connections with bridges for the roads and tunnels for the rail links. The least costly option is for a twin deck bridge carrying road and electric rail links with two lanes of vehicle traffic in either direction on one deck and twin tracks on the other. The most costly option will be for a bridge carrying twin traffic lanes in either direction as well as a tunnel for the twin track rail connection. A feasibility study is being carried out by the Giprotransmost Institute, which will be completed by November 2014. This study will determine the project costs more accurately, allowing Avtodor to decide on which of the eight alternatives will be selected.

This is not the first bridge to be constructed across the Kerch Strait. Russian forces built a rail connection across the Kerch Strait, which was opened in late 1944 and carried troops. However the bridge was destroyed by ice flows in early 1945 and it was not rebuilt. There have been plans to build a bridge across the Kerch Strait since the collapse of this first structure, however these have been hampered by the sometimes difficult relations between the Ukraine and Russia. The problems between the two nations reached a head in 2003 over the disputed territory of Tuzla Island, lying in the Kerch Strait, due in part to the construction of a dam linking Russia to the island.

The project to build road and rail links has since been revived although it is not clear how the most recent spate of troubles between Ukraine and Russia will affect plans for the road and rail link.

For more information on companies in this article

Related Content

  • Russia new programme for developing high-speed roads
    January 14, 2019
    Russia has approved a new state programme for the development of its high-speed road network – Eugene Gerden reports The Russian government has officially approved a new state programme, which is aimed at developing the federal high-speed road network in the country. This programme will run until 2030, according to recent statements by the official state press-service. According to some leading Russian experts in the roadbuilding sector, the need to implement these plans is acute. At present the tota
  • UK smart motorway work for M4 link
    September 16, 2019
    Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la
  • Metro Pacific Tollways starts work on Cebu-Cordova Link bridge
    July 10, 2018
    Metro Pacific Tollways has started construction of a toll bridge to connect Mactan island to mainland Cebu.
  • Further delays expected for the Fehmarn Belt Fixed Link
    August 26, 2015
    Further delays to the planned Fehmarn Belt Fixed Link between Germany and Denmark appear likely because of objections to the project during the planning stages, Danish media reported. Government authorities in the German state of Schleswig-Holstein indicated that permission for the project, which focusses on a 17km immersed road and rail tunnel, will probably be given in 2017, and not next year as previously believed. German authorities have received about 3,100 objections to the project that has rise