Skip to main content

New cable-stayed bridge for China’s Jiangsu Province

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.
January 14, 2019 Read time: 1 min

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.

Related Content

  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Myanmar bridge construction project underway
    February 18, 2019
    Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help