Skip to main content

New bridge spanning Kelani River in Sri Lanka

Work is underway in Sri Lanka on a new bridge spanning the Kelani River. The Japan International Cooperation Agency is supplying funding worth some US$344.4 million for the bridge project, which is intended to improve transport connections to and from capital Colombo. The project is facing design challenges as the river is prone to flooding. As a result the design of the bridge features a thick deck and short towers, but without any piers. The 380m long structure will carry six lanes of traffic, with three
April 8, 2014 Read time: 1 min
Work is underway in Sri Lanka on a new bridge spanning the Kelani River. The 3349 Japan International Cooperation Agency is supplying funding worth some US$344.4 million for the bridge project, which is intended to improve transport connections to and from capital Colombo. The project is facing design challenges as the river is prone to flooding. As a result the design of the bridge features a thick deck and short towers, but without any piers. The 380m long structure will carry six lanes of traffic, with three in either direction. Once the bridge is complete it is expected to cut journey times as drivers will be able to use this link rather than a longer route involving crossing bridges some distance away at Orugodawatte.

Related Content

  • Ethiopia’s new tolled highway opens
    June 21, 2019
    Ethiopia is now benefiting from a new tolled route, improving transport between Dire Dawa and Dewele.
  • Texas launches US$414 million project to expand North Tarrant Express
    November 24, 2023
    Texas is launching a US$414 million project to expand part of the North Tarrant Express.
  • Rebuild project for historic Pennsylvania bridge
    September 10, 2015
    Rebuilding work is planned for a historic bridge in the US state of Pennsylvania to ensure it remains able to carry current traffic volumes. The work is being managed by consulting engineer Michael Baker International. Pennsylvania Department of Transportation (PennDOT) selected Michael Baker International for the US$5 million engineering and design project that will focus on the western spans of the Market Street Bridge in Harrisburg. Rehabilitating this critical traffic artery in Pennsylvania's capital re
  • North Viaduct completed on UK’s Mersey Gateway bridge project
    April 19, 2017
    Concrete finishing work has started on the completed north approach viaduct of England’s new 2.13km Mersey Gateway project. Over the past three years, around 18,400m³of concrete was used to build the viaduct. When complete near the end of this year, around 60,000 vehicles are expected to use the toll bridge every day, or nearly 22 million vehicles annually.