Skip to main content

New bridge for Drammen, Norway

A new bridge will be built in Drammen, Norway.
By MJ Woof January 19, 2021 Read time: 2 mins
A new bridge is planned for the Norwegian city of Drammen – image © courtesy of Kvant
A new bridge is to be constructed in the Norwegian city of Drammen. The new bridge will measure 280m in length and will be designed by a team comprising Knight Architects (UK), Saaha (NO), structural engineers Degree of Freedom (NO) and landscape architect Asplan Viak (NO).The new structure will replace an 84-year-old road bridge that spans the River Drammenselva and the local rail station.

The new landmark bridge project forms a key component for the port city’s redevelopment programme. The new City Bridge starts at the station square in Strømsø, the southern part of the city, crossing the newly redeveloped Drammen Rail station, including four platforms and six rail tracks, before stepping over the 150m wide Drammenselva river and tying into the central public square of Bragernes, on the north side of the city. Six stair ramps will provide access to the platforms of the station and to the promenade along the south shore.

The new bridge 19.4m-wide, compared with 15m for the old structure. This will provide additional space for vulnerable road users, while the central carriageway has been designed exclusively for public transport. 

The central element of the bridge, the main river crossing, will be a pair of low lying, shallow steel arches spanning 85m between two narrow piers located close to the river shores.

At both ends of the bridge, significant consideration has been taken to provide a seamless transition between the deck and the local pedestrian and cycle routes. The promenade on the south bank, providing fishing spots and mooring for small boats, will be accessed from the bridge via a bespoke lift.

The development is a joint operation by the City of Drammen (Drammen Kommune) and the Norwegian rail authority Bane NOR which is carried out in two separate lots. Detailed design stage of the bridge will finish in March 2021 and the construction tender will be announced before summer 2021.

Construction works, including the demolition of the existing bridge and the erection of a temporary crossing, will start in 2022. The opening of the new City Bridge is scheduled for 2025.

Related Content

  • Doka’s Voest Bridge bypass project
    February 10, 2020
    The Voest Bridge over the Danube River is part of the A7 Mühlkreis Autobahn through Linz, Austria, is 40 years. Two bypass bridges are being constructed alongside the existing cable-stayed bridge as part of the client ASFINAG’s strategy to boost traffic capacity - around 100,000 vehicles cross the old bridge each day.
  • New funding for 44 infrastructure projects
    December 26, 2024
    New funding awards escalate the launch of 44 major infrastructure projects.
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s