Skip to main content

New bridge being completed in Colombia

A key bridge link is due for completion in Colombia shortly. The new Moravia bridge forms part of the Santa Madre Laura road project and should be complete in April 2016. The bridge is over 500m long and has cost some US$46.8 million to build. The work is being carried out by construction consortium Bermejal. Once open to traffic the bridge will help to reduce traffic on the existing Barranquilla and Mico bridges by providing an alternative route to west Medellin.
January 19, 2016 Read time: 1 min
A key bridge link is due for completion in Colombia shortly. The new Moravia bridge forms part of the Santa Madre Laura road project and should be complete in April 2016. The bridge is over 500m long and has cost some US$46.8 million to build. The work is being carried out by construction consortium Bermejal. Once open to traffic the bridge will help to reduce traffic on the existing Barranquilla and Mico bridges by providing an alternative route to west Medellin.

Related Content

  • New barrier, crash cushion and access control technology will benefit road user safety
    October 26, 2012
    Protecting road users, with barriers, crash cushions or access control systems, is crucial for network safety - Mike Woof writes Tough regulations are now in place in Europe and the US, requiring road authorities to provide safer road infrastructure than in the past. Technologies to reduce the severity of vehicle impacts against obstructions or redirect vehicles into the roadway should help cut injuries amongst drivers and passengers alike. The specifications for the use of crash cushions and barriers can v
  • Another US$94.08mn for repairs to Hammersmith flyover in London
    June 14, 2013
    A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
  • New road link for Angola’s Luanda Airport
    September 13, 2016
    New road links will be constructed to Luanda’s International Airport in Angola, in a bid to improve traffic flow and cut congestion. This US$695 million package of works has been awarded by Angola’s Transport Ministry and will be carried out by Chinese contractor Tiesiju Engineering, which is part of the China Railway Engineering Corporation. The work includes upgrading various access roads around the airport, as well as widening the Via Express route, which runs around Angola’s capital city. The airport is
  • China opens record-breaking bridge
    February 22, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o