Skip to main content

New Australia bridge built at the weekend

In Adelaide, South Australia, a new bridge has been constructed over the Southern Expressway. The 180m long bridge weighs 3,000tonnes and was slid into place over the weekend of the 25th and 26th November, 2017. The Main South Road bridge project has cost US$494 million (A$620 million). A second span will be slid into position in early 2018. The project method has called for the construction of the bridges adjacent to the installation site, the first time the technique has been utilised in Australia.
November 27, 2017 Read time: 1 min

 In Adelaide, South Australia, a new bridge has been constructed over the Southern Expressway. The 180m long bridge weighs 3,000tonnes and was slid into place over the weekend of the 25th and 26th November, 2017. The Main South Road bridge project has cost US$494 million (A$620 million). A second span will be slid into position in early 2018. The project method has called for the construction of the bridges adjacent to the installation site, the first time the technique has been utilised in Australia.

Related Content

  • Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway
    August 1, 2013
    A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Go-ahead for new Forth Road Bridge
    March 1, 2012
    Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.