Skip to main content

Netherlands: Velsertunnel to be closed for nine months

The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations. Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work. Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supp
April 19, 2016 Read time: 2 mins
The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations.

Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work.

Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supported by iNFRANEA. Last year the consortium completed a 3-D BIM model (Building Information Modelling) of the tunnel and of the proposed work to be done. %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit bimontherocks.com website false http://bimontherocks.com/bim-helps-renovate-aging-tunnel/ false false%> for the presentation.

The renovated tunnel will have a 12cm higher clearance profile for trucks, new asphalt and modern technical installations, such as CCTV, fire protection equipment, traffic control systems and ventilation. Escape routes will also be fully updated.

Under the contract, the original and now iconic ventilation towers reaching skyward atop the main ventilation building must remain intact. The unusual-looking towers were listed as a national heritage site in 2014.

Around 65,000 vehicles a day use the tunnel and traffic will be diverted to the Wijkertunnel, a toll tunnel.

The Wijkertunnel is a 21-year old structure that is the first public-private partnership in the Netherlands. Three-quarters of the total €272 million construction cost was put up by a consortium of banks and insurance companies, including ING and Commerzbank. The contract was for 30 years.

Related Content

  • Hewden sets date for used plant and equipment auction online
    August 3, 2015
    Europe’s largest direct from user auction event, the Hewden August Auction, will be held August 12. The Hewden August auction features power tools, generators, power and lighting towers, amp welders and even 13tonne Caterpillar excavators. The auction comprises ex-rental machinery and cranes owned and operated from new by Hewden. For those who cannot make the event in person, the auction is powered online by Proxibid, where the online provider’s fraud protection technology protects both buyers and seller
  • New Putzmeister truck mixer Intermat
    January 6, 2017
    Putzmeister has redeveloped its Pumi truck-mounted rotor pump to improve its performance.
  • New Putzmeister truck mixer Intermat
    February 21, 2012
    Putzmeister has redeveloped its Pumi truck-mounted rotor pump to improve its performance.
  • Think global act local: Terex expands global operations
    January 6, 2017
    Terex boss Ron DeFoe has spoken about the company’s expanded global strategy and confirmed his thoughts about the threat represented by Chinese manufacturers. “This year has started well for the Terex organisation and we are confident that our markets are moving into an extended cycle of economic growth right around the globe. As a result we are forecasting a significant growth in sales from US$6.5 billion (2011) to US$8.5 billion,” he said.