Skip to main content

Netherlands: Velsertunnel to be closed for nine months

The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations. Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work. Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supp
April 19, 2016 Read time: 2 mins
The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations.

Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work.

Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supported by iNFRANEA. Last year the consortium completed a 3-D BIM model (Building Information Modelling) of the tunnel and of the proposed work to be done. %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit bimontherocks.com website false http://bimontherocks.com/bim-helps-renovate-aging-tunnel/ false false%> for the presentation.

The renovated tunnel will have a 12cm higher clearance profile for trucks, new asphalt and modern technical installations, such as CCTV, fire protection equipment, traffic control systems and ventilation. Escape routes will also be fully updated.

Under the contract, the original and now iconic ventilation towers reaching skyward atop the main ventilation building must remain intact. The unusual-looking towers were listed as a national heritage site in 2014.

Around 65,000 vehicles a day use the tunnel and traffic will be diverted to the Wijkertunnel, a toll tunnel.

The Wijkertunnel is a 21-year old structure that is the first public-private partnership in the Netherlands. Three-quarters of the total €272 million construction cost was put up by a consortium of banks and insurance companies, including ING and Commerzbank. The contract was for 30 years.

Related Content

  • Think global act local: Terex expands global operations
    April 19, 2012
    Terex boss Ron DeFoe has spoken about the company’s expanded global strategy and confirmed his thoughts about the threat represented by Chinese manufacturers. “This year has started well for the Terex organisation and we are confident that our markets are moving into an extended cycle of economic growth right around the globe. As a result we are forecasting a significant growth in sales from US$6.5 billion (2011) to US$8.5 billion,” he said.
  • Plans are moving ahead on the new Argentina-Chile tunnel
    June 24, 2013
    Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
  • FPT Industrial reveals R22 three-cylinder engine
    January 6, 2017
    FPT Industrial’s latest compact diesel engine is the R22 – a three-cylinder power unit that covers the 33-52kW sector. Based on one of the firm’s VM engine platforms, the R22 has adopted a single canister approach to achieving Tier 4 Final emissions legislation.
  • FPT Industrial reveals R22 three-cylinder engine
    March 8, 2014
    FPT Industrial’s latest compact diesel engine is the R22 – a three-cylinder power unit that covers the 33-52kW sector. Based on one of the firm’s VM engine platforms, the R22 has adopted a single canister approach to achieving Tier 4 Final emissions legislation.