Skip to main content

Netherlands: Velsertunnel to be closed for nine months

The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations. Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work. Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supp
April 19, 2016 Read time: 2 mins
The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations.

Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work.

Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supported by iNFRANEA. Last year the consortium completed a 3-D BIM model (Building Information Modelling) of the tunnel and of the proposed work to be done. %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit bimontherocks.com website false http://bimontherocks.com/bim-helps-renovate-aging-tunnel/ false false%> for the presentation.

The renovated tunnel will have a 12cm higher clearance profile for trucks, new asphalt and modern technical installations, such as CCTV, fire protection equipment, traffic control systems and ventilation. Escape routes will also be fully updated.

Under the contract, the original and now iconic ventilation towers reaching skyward atop the main ventilation building must remain intact. The unusual-looking towers were listed as a national heritage site in 2014.

Around 65,000 vehicles a day use the tunnel and traffic will be diverted to the Wijkertunnel, a toll tunnel.

The Wijkertunnel is a 21-year old structure that is the first public-private partnership in the Netherlands. Three-quarters of the total €272 million construction cost was put up by a consortium of banks and insurance companies, including ING and Commerzbank. The contract was for 30 years.

Related Content

  • Wacker Neuson launches DT15 dumper
    March 8, 2012
    Wacker Neuson say the potentially self-loading DT15 crawler-mounted dumper is a must for business efficiency.
  • Early opening for Arizona’s first P3 deal, South Mountain Freeway
    June 27, 2017
    Arizona's first highway public-private partnership will open in 2019, three years earlier than scheduled, the state transportation department said.
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als