Skip to main content

Early opening for Arizona’s first P3 deal, South Mountain Freeway

Arizona's first highway public-private partnership will open in 2019, three years earlier than scheduled, the state transportation department said.
June 27, 2017 Read time: 1 min

Arizona's first highway public-private partnership will open in 2019, three years earlier than scheduled, the state transportation department said.

The development consortium Connect 202 Partners said it had revised the finish date for the US$1.9 billion project by constructing the final section all at once. Connect 202 Partners is working under a 30-year design, build and maintain contract for the 35.5km route.

The South Mountain Freeway refers to a segment of State Route 202, or Loop 202, a partial beltway around the eastern Phoenix metropolitan area of central Arizona. It crosses the eastern end of the city of Phoenix, from Chandler to the Papago Freeway (I-10) in west Phoenix.

The other two segments are called Red Mountain Freeway and Santan Freeway. Red Mountain runs from the Mini Stack Interchange in Phoenix to the SuperRedTan Interchange in Mesa. Santan Freeway goes from the SuperRedTan Interchange to Maricopa Freeway (I-10) in Chandler.

A fly-through %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal video visualisation false http://www.azdot.gov/ true false%> is available free on the website of the Arizona Department of Transportation.

Related Content

  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • First public outing for Liebherr tower crane at INTERMAT
    January 6, 2017
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
  • First public outing for Liebherr tower crane at INTERMAT
    April 20, 2012
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.