Skip to main content

Netherlands: BBV24 consortium to appeal Blankenburg Tunnel deal

In the Netherlands, the consortium of BBV24 is appealing the awarding of the Blankenburg Tunnel construction contract to another consortium, BAAK Blankenburg-Verbinding. BAAK Blankenburg-Verbinding – consisting of Dutch construction firm Ballast Nedam, Belgian dredging company Deme and Australian investment bank Macquarie – won the contract earlier this year.
September 27, 2017 Read time: 2 mins
In the Netherlands, the consortium of BBV24 is appealing the awarding of the Blankenburg Tunnel construction contract to another consortium, BAAK Blankenburg-Verbinding.


BAAK Blankenburg-Verbinding – consisting of Dutch construction firm 8636 Ballast Nedam, Belgian dredging company 8637 Deme and Australian investment bank 2378 Macquarie – won the contract earlier this year.

The deal is for a tunnel under the Nieuwe Waterweg river west of Vlaardingen, a city in southern Holland and on the north bank of the river Nieuwe Maas where it meets the Oude Maas.

The public-private partnership is worth around €1.2 billion, including design, construction and 20 year’s maintenance. The tender was awarded by Rijkswaterstaat, the Directorate-General for Public Works and Water Management.

Dutch media report that the government documents state the contract was awarded on price, CO2 emissions, traffic disruption and other quality-related criteria. BBV24 – consisting of VolkerWessels, 1355 Boskalis and 7456 BAM - reportedly has asked for clarification of the awarding procedure but has not received answered from the agency.

The project will connect the A20 motorway to the A15 motorway, with site work to start next year. Work includes construction of two junctions and the widening the A20 between the A24 and the Kethelplein junction.

The project is part of the masterplan Rotterdam Vooruit to develop the Rotterdam region between 2020-2040.

For more information on companies in this article

Related Content

  • Poland's complex road dispute
    March 1, 2012
    The complex legal case between the Polish General Directorate for National Roads and Motorways (GDDKiA) and Austrian contractor Alpine Bau is continuing in the Polish courts.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31
  • Spain eyes new standard contract for long-term road development
    November 7, 2018
    Spain is looking to revamp its contractual formulae for large infrastructure work following moves to limit profits from long-term concession deals. The Ministry of Works is putting together a hybrid contract template for use with the Extraordinary Investment Plan for Roads. The previous government had tried to launch the investment plan on the back of around 20 concession contracts of over 20 years. The hybrid contract would aim to save road investments worth around €5 billion. It would be a mixed con
  • Arctic Infra wins Autio-Anttis Väg 395 deal
    April 25, 2023
    The €16.21 million deal involves widening and strengthening 20km of road between Autio and Anttis in Pajala municipality in northern Sweden.