Skip to main content

Spain eyes new standard contract for long-term road development

Spain is looking to revamp its contractual formulae for large infrastructure work following moves to limit profits from long-term concession deals. The Ministry of Works is putting together a hybrid contract template for use with the Extraordinary Investment Plan for Roads. The previous government had tried to launch the investment plan on the back of around 20 concession contracts of over 20 years. The hybrid contract would aim to save road investments worth around €5 billion. It would be a mixed con
November 7, 2018 Read time: 2 mins
Spain is looking to revamp its contractual formulae for large infrastructure work following moves to limit profits from long-term concession deals.


The Ministry of Works is putting together a hybrid contract template for use with the Extraordinary Investment Plan for Roads. The previous government had tried to launch the investment plan on the back of around 20 concession contracts of over 20 years.

The hybrid contract would aim to save road investments worth around €5 billion. It would be a mixed contract, with two years of construction and five years of concession including maintenance.

The Spanish concession sector has been in turmoil since lower-than-predicted traffic volumes forced several large concessionaires into bankruptcy. Earlier this year, the Spanish government calculated the cost of rescuing the nine bankrupt motorways at €1.8 billion. This is about 10% less than previously estimated, according to a report in the Spanish financial newspaper Expansión.

The government has been trying for the past several years to facilitate a deal with banks to get the motorways out of debt and so to not add to the state’s own debt.

In 2017,  the government agreed that the state-owned transport infrastructure firm Seittsa would manage the nine bankrupt motorways.

Related Content

  • Spanish government reduces motorway rescue cost
    May 8, 2018
    The Spanish government has calculated the cost of rescuing Spain's nine bankrupt motorways at €1.8 billion. This is about 10% less than previously estimated, according to a report in the Spanish financial newspaper Expansión. The government has been trying for the past three years to facilitate a deal with banks to get the motorways out of debt and so to not add to the state’s own debt. Many of the nine projects were built prior to the financial crisis and traffic volumes were optimistically high.
  • Seittsa set to take on management of bankrupt Spanish motorways
    July 31, 2017
    The Spanish government has given the green light for the state-owned transport infrastructure firm Seittsa to manage nine bankrupt toll motorways. The deal is for Seittsa to prepare the terms for their retender to private companies by the end of next year. Spanish media report that the cost is set to be lower than the €3.5 billion previously estimated by some analysts. The arrangement comes after three years of failed attempts by the government to step in and facilitate debt restructuring between the invest
  • Julián Núñez, head of ASECAP offers a little Spanish enlightenment
    May 1, 2018
    Julián Núñez, president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth. People want to avoid the pain. This is perhaps a bad analogy to use in the case of Julián Núñez, president of ASECAP - European Association of Operators of Toll Road Infrastructures. Núñez had just sat
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas