Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Nepal-China connection
    May 14, 2012
    The Chinese Government is building a 100m long bridge over the Trishuli River that will improve connections from Nepal-China. The structure will be located in Rasuwaghadi and the project has been planned after both countries agreed a deal for this second friendship bridge. The bridge is expected to cost US$ 1.42 million and its construction is being funded by the Chinese Government. The new link will connect the Rasuwaghadi Highway with China and is expected to help develop cross-country trade and transport
  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • Brazil's flood damage
    February 23, 2012
    Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
  • Brazil's flood damage
    May 3, 2012
    Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal.