Skip to main content

Brazil's flood damage

Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal.
May 3, 2012 Read time: 1 min
Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal. Of the funding allotted to the work around $177.4 million will be needed for bridge rebuilding, with some $66.2 million needed for road repairs. Many bridges suffered severe scour due to the flooding, resulting in structural problems as well as a number of collapses.

Related Content

  • Brazil's flood damage
    February 23, 2012
    Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
  • Rio’s 2014 roads plan
    May 11, 2012
    The authorities in Brazil’s Rio de Janeiro State intend to invest US$1.55 billion in the road network from now until 2014. Work will be carried out to some 750km of roads with funding being provided by a combination of PPPs and sources such as the World Bank (WB) and the Latin American Development Bank (CAF).
  • Climate change is damaging roads
    August 16, 2018
    With 2018 well under way, the ravages of extreme weather in recent months is now sadly apparent on the road network in many countries, and even on many continents. In East Africa, heavy rains have overwhelmed storm drains in many areas, with flood waters washing away vehicles and damaging road surfaces in urban and rural areas alike. Road repairs are now having to be carried out in Kenya, Rwanda, Tanzania and Uganda to patch up surfaces that have been washed away, along with the replacement of signage and
  • Brazil road concessions ending
    January 8, 2019
    A number of major road concession agreements in Brazil are coming to the end of their terms by 2021. This includes eight concession packages for key routes, extending some 2,400km in all and generating over US$521 million/year in toll revenue. Tendering will have to be carried out for all of these routes, with two of the most prominent being the Nova Dutra highway linking Sao Paulo with Rio de Janeiro and the 218km Washington Luis highway in Sao Paulo State. At present CCR has the concession for the Nov