Skip to main content

Nepalese bridge issues

In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.
May 4, 2012 Read time: 2 mins
In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.

The suspension bridge over the Trishuli River was built 18 years ago and connected Bhumlichowk in Gorkha district and Fishling of Chitwan district, close to the Prithivi Highway.

The Indian bridge that collapsed was considerably older and may have dated back before India gained its independence according to sources. The structure was located some 80km from Darjeeling and connected Bijanbari with Chungthung providing a key route for the local tea industry.

On a more positive note, Nepal’s Ministry for Physical Planning and Works has inaugurated work to a bridge over Kamala River. This bridge will connect the Siraha and Dhanusa district headquarters and forms part of the Postal Highway network.

The pre-stressed girder bridge will measure 450m long by 7.5m wide and will be completed within the end of 2014, reducing the current journey distance from Siraha – Janakpur. The country’s new Postal Highways will boost development of the Terai Region and are being prioritised. Work to a further 53 bridges will also form part of the Postal Highway system and some funding will be provided by India.

Related Content

  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Foreign firms bid offer for Kathmandu-Tarai Fast Track Project
    July 20, 2012
    The Nepalese government is inviting overseas firms to submit expressions of interest in taking part in the Kathmandu-Tarai Fast Track Project. The built-operate-transfer-based project will cost over US$ 906.41million (NPR 80bn). The expressway will span across 76kms. As much as 10% investment on the project's total cost can be invested by Nepali firms via joint venture or a consortium with overseas companies.
  • Norsenga Bridge undergoes weathering tests
    May 19, 2023
    Norway’s Statens Vegvesen says the wooden truss bridge – opened only in 2017 – will be the subject of a study in conjunction with the Norwegian University of Science and Technology.
  • Nepal's highway plans
    March 22, 2012
    The Nepalese Government is working on plans to build a series of highways that will improve north-south connectivity for this mountainous country.