Skip to main content

Nepalese bridge issues

In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.
May 4, 2012 Read time: 2 mins
In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.

The suspension bridge over the Trishuli River was built 18 years ago and connected Bhumlichowk in Gorkha district and Fishling of Chitwan district, close to the Prithivi Highway.

The Indian bridge that collapsed was considerably older and may have dated back before India gained its independence according to sources. The structure was located some 80km from Darjeeling and connected Bijanbari with Chungthung providing a key route for the local tea industry.

On a more positive note, Nepal’s Ministry for Physical Planning and Works has inaugurated work to a bridge over Kamala River. This bridge will connect the Siraha and Dhanusa district headquarters and forms part of the Postal Highway network.

The pre-stressed girder bridge will measure 450m long by 7.5m wide and will be completed within the end of 2014, reducing the current journey distance from Siraha – Janakpur. The country’s new Postal Highways will boost development of the Terai Region and are being prioritised. Work to a further 53 bridges will also form part of the Postal Highway system and some funding will be provided by India.

Related Content

  • Changes possible for Lake Mjøsa Bridge
    September 28, 2022
    The proposed four-lane wooden bridge across Norway’s Lake Mjøsa would be the second such structure and part of the new E6 highway project.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Nepal sets major infrastructure programme in motion
    February 15, 2012
    The Nepalese Government is setting out a strategy to invest heavily in its transport connections. The country has set a budget of US$5.49 billion for the fiscal year 2011-2012, with $530 million to be spent on the infrastructure development programme.
  • Peri’s new MXK lightweight platform makes London debut
    July 8, 2015
    The new platform system MXK from German-based manufacturer Peri is easily assembled to suit site requirements. The flexible platform system with lightweight brackets is assembled at ground level, using lightweight components – scaffold support bracket stop-end rails, guardrail posts, the scaffold deck and the side mesh barriers PMB. Flexibility is the key, said Peri UK managing director Alasdair Stables during an indoor demonstration day held in the docklands area of the UK capital London. The object