Skip to main content

The Nepalese authorities are now addressing structural problems on a series of important bridge links in the country

Major structural problems have been identified in several bridges in Nepal.
March 1, 2012 Read time: 2 mins
Major structural problems have been identified in several bridges in Nepal. Construction work on seven large bridges in Nepal has been halted due to the problems arising in the pier construction.

Work has been stopped on bridges located at Ghurmi and carrying the Udayapur-Okhaldhunga road over the Sunkoshi River and at Khurkot carrying the Sindhuli-Manthali road over the Sunkoshi River. Work has also halted on a bridge in West Nepal carrying the Chnichu-Jajarkot road over the Bheri River, on the Tawa River bridge, the Siwai bridge, the Tadi bridge at Nuwakot and on the bridge over the Junga River at Dhanusa.

A bridge expert in Nepal says that due to geological conditions in Nepal, pier construction faces problems. The expert suggests that bridges with piers should be avoided in the country and that arched structures, though more expensive to build, are more suitable for the country's rugged terrain and would offer long term cost benefits through reduced maintenance needs.

Pier problems at the Bheri Bridge have resulted in it being replaced by a suspension bridge and this has been suggested as another suitable bridge design solution for the country. The issue is endemic, with the country's geology and geography playing a key role. Bridge scour is a serious problem in Nepal, due to the country's mountainous terrain, deep rock valleys and fast flowing rivers. 2664 Nepal's Department of Roads has issue a notice that a further seven bridges are in a serious condition and require repairs.

Bridges requiring repair are at Mugling carrying the Prithvi Highway, the Marsyangdi Bridge carrying the Aanbukhaireni-Gorkha road, the Seti bridge carrying the Khaireni-Bhimad road, the Jharahi bridge carrying the Mahendra highway and the Kaligandaki bridge carrying the Siddhartha highway. The other structures are the Bheri bridge carrying the Ratna highway, the Tamakoshi bridge carrying the Lamosanghu road, the Sunkoshi bridge carrying the Lamosanghu - Jiri road and the Tadi bridge carrying the Pasanglamhu road.

For more information on companies in this article

Related Content

  • Crane fleet helping construct Indian highway
    January 5, 2015
    Manitowoc’s Grove cranes are helping transform a major highway in north west India, writes Mike Woof In India a fleet of rough terrain cranes has played a key role in constructing a major highway project.
  • MB’s versatile crusher buckets entering Chinese market
    November 21, 2018

    MB crusher is now offering its high performance crusher buckets into the Chinese market, as well as the rest of South East Asia. The firm is introducing two models for excavators, the BF120.4 model to China, which is suitable for excavators in the 30tonne class and above, as well as the BF90.3, which is suited for excavators weighing from 21tonnes and above. In addition, MB Crusher is now offering the MB-L200 crusher bucket, which is designed for use with wheeled loaders, backhoe loaders and skid steer loaders.

  • Brazil's flood damage
    February 23, 2012
    Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
  • Brazil's flood damage
    May 3, 2012
    Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal.