Skip to main content

Nepal bridge closes due to defect

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
March 14, 2019 Read time: 1 min
The steel bridge spanning the Bijaypur River in Nepal has had to be closed for repairs

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural
members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting
a temporary structure upstream of the damaged bridge, while a study team has been formed to assess the situation and provide a long term solution.

Related Content

  • Norway: landslide closes bridge amid concerns for infrastructure
    February 12, 2015
    A bridge carrying one of Norway’s busiest motorways remains closed after a major earth slide severely damaged its supporting columns this week. The bridge closure comes as Norway’s Public Roads Administration said it is concerned about the condition of 104 bridges throughout the country, although they remain safe to use. Two of the foundation pillars of the bridge at Holmestrand, along the Highway E-18 through Vestfold County, were affected and dropped a span by up to 1.5m, creating a severe dip and crack
  • The need to repair and replace the world's bridges
    March 13, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector.
  • The need to repair and replace the world's bridges
    February 22, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector. All over the world existing highway bridges are in need of repair and replacement, with potentially catastrophic consequences should this need be ignored.
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b