Skip to main content

Moscow road and tunnel tendering

The tender process is opening for a tunnel section as well as linking roads for a project in Moscow. The project will form part of the Stolbovo transport hub. The tunnel will measure 1,.47km long, while the project includes building 7km of roads in Moscow’s Troitsky and Novomoskovsky Administrative Districts (TNAD) in the south west of the city. Also included in the work will be a 2670km overpass section as well as utilities and the construction phase has to be completed within a 17 month period.
June 11, 2018 Read time: 1 min

The tender process is opening for a tunnel section as well as linking roads for a project in Moscow. The project will form part of the Stolbovo transport hub. The tunnel will measure 1,.47km long, while the project includes building 7km of roads in Moscow’s Troitsky and Novomoskovsky Administrative Districts (TNAD) in the south west of the city. Also included in the work will be a 2670km overpass section as well as utilities and the construction phase has to be completed within a 17 month period.

Related Content

  • A series of upgrades will improve Moscow’s road network
    October 26, 2012
    A series of major road projects will help improve Moscow’s connectivity. Russian contractor Mostotrest is to rebuild a series of road connections in Moscow, following the agreement of a deal with the Moscow Construction Department. The road building work will be on the southern section of the North-West Chord, a junction with the Skolkovo Highways and the Moscow Ring Road. Mostotrest will also construct new infrastructure and the whole package of works is worth some US$1.13 billion. The work will be carried
  • Third section of Moscow ring road project
    August 10, 2017
    Financing is being secured for the project to build the third section of Moscow’s ring road. A loan worth around US$642 million will be provided by three banks, the Sberbank, Gazprombank and Eurasian Development Bank (EDB). This section of the ring road lies to the north of the city and measures 105.3km long. The loan for the PPP toll road will be for a 16-year period with the building work being carried out by the Road Construction Corporation. The ring road forms an important link in the chain for the roa
  • Colombia tunnel construction contract commencing
    February 5, 2018
    Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.
  • Tunnel for Colombia’s Calarca – Cajamarca Highway
    May 23, 2014
    A new tunnel is forming an important link for a major Colombian highway - Mauro Nogarin reports Work on a major highway project is underway in Colombia, forming part of the Bogota-Buenaventura Corridor. The highway has a length of 503km and is located in central Colombia, connecting the departments of Tolima and Quindio, across the central Andes, with a total cost of around US$330 million. A key section of the project consists of building a unidirectional tunnel of approximately 8.65km in length. Anot