Skip to main content

Montreal’s Champlain Bridge opens but late and over-budget

Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
June 27, 2019 Read time: 2 mins
Montreal’s Champlain Bridge opens but late and over-budget
Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports.


Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River.

The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. According to media reports, the old bridge was the busiest in Canada, carrying over 50 million vehicles a year and an estimated $15 billion worth of trade.

Signature on the St Lawrence (SSL) - led by Canada-based SNC-Lavalin Group - is the private consortium that built the six-lane public-private project under a 30-year contract.

The new and old bridges are named after the French explorer Samuel de Champlain who founded Quebec City, the Quebec province’s capital, in 1608. Work includes construction of a smaller bridge for Île des Soeurs - Nun’s Island - and widening Autoroute 15 through the centre of Montreal.

World Highways %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external reported false https://www.worldhighways.com/categories/road-highway-structures/features/montreals-new-champlain-bridge-is-shaping-up-for-christmas/ false false%> on the progress of the bridge last year.

Related Content

  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Northern Spire wins award from UK’s Association for Project Management
    November 30, 2018
    The Northern Spire bridge in Sunderland, northern England, has beaten off stiff competition to win another national construction and engineering award. The Spire, which opened in August this year at a cost of €132 million, was named Project of the Year: Engineering, Construction and Infrastructure 2018 by the UK’s Association for Project Management. The award is the latest honour for Sunderland’s 105m-tall cable-stayed bridge which links Castletown on the north side of the River Wear with Pallion.
  • Speedy launches new catalogue - print, online and app
    July 7, 2016
    UK-based equipment hire specialist Speedy has launched a new catalogue, including an app, for 2016 with more than 2,800 products and services across over 25 categories. The app is available on iPhone, Android and Windows Phone. Features of the new app include a product search by keyword or code, complete product detail, including pricing and images as well as a local depot locator. Russell Down, Speedy’s chief executive, said that by reducing the catalogue by 96 pages and changing to a more sustainab