Skip to main content

Montreal’s Champlain Bridge opens but late and over-budget

Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
June 27, 2019 Read time: 2 mins
Montreal’s Champlain Bridge opens but late and over-budget
Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports.


Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River.

The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. According to media reports, the old bridge was the busiest in Canada, carrying over 50 million vehicles a year and an estimated $15 billion worth of trade.

Signature on the St Lawrence (SSL) - led by Canada-based SNC-Lavalin Group - is the private consortium that built the six-lane public-private project under a 30-year contract.

The new and old bridges are named after the French explorer Samuel de Champlain who founded Quebec City, the Quebec province’s capital, in 1608. Work includes construction of a smaller bridge for Île des Soeurs - Nun’s Island - and widening Autoroute 15 through the centre of Montreal.

World Highways %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external reported false https://www.worldhighways.com/categories/road-highway-structures/features/montreals-new-champlain-bridge-is-shaping-up-for-christmas/ false false%> on the progress of the bridge last year.

Related Content

  • Armenia’s road safety problem is critical
    March 9, 2018
    Armenia is facing a crisis in road safety, according to the World Health Organisation (WHO). The rate of road traffic fatalities in Armenia is 18.3/100,000 population according to the WHO 2015 Global Status Report on Road Safety. This is the highest rate in any Eastern European or Caucasus country, and costs an estimated 4.62% of GDP/year. Establishing partnerships with local authorities is a vital step towards improving road safety, saving lives and developing the economy. EASST partner Poghos Shahinyan,
  • International Transport Forum: public vs private policy debate
    December 4, 2014
    Simply banning cars in parts of major cities will not necessarily greatly improve the air quality over time, a new report has found. The answer for cutting carbon emissions is to get the right balance of private and public transportation along with infrastructure developed to sustain the mix, according to the International Transport Forum (ITF), a think tank within the Organisation of Economic Cooperation and Development (OECD). The ITF evaluated the potential impact of transport policies on urban carbon
  • Montreal's new Champlain Bridge ready by 2018
    December 2, 2013
    Montreal’s Champlain Bridge will be replaced by 2018, according to the Canadian federal government. The government pledge is three years earlier than the original plans to replace the landmark structure. The new US$ 4.71 billion (CAD 5 billion) toll bridge is to be constructed through a public-private partnership and the procurement process is set to commence in spring 2014. Poul Ove Jensen has been selected by the government to design the replacement Champlain Bridge which, with its almost 160,000 daily
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t