Skip to main content

Marão road tunnel construction in Portugal back on track after 2-year halt

The construction of the Marão road tunnel in Portugal will be resumed in the first half of 2014 – ending a two-year suspension of works due to the financial constraints of the winning Somague-led build consortium.
January 22, 2014 Read time: 1 min

The construction of the Marão road tunnel in Portugal will be resumed in the first half of 2014 – ending a two-year suspension of works due to the financial constraints of the winning Somague-led build consortium.

The concession for the tunnel, which, at 5.6km, will be Portugal’s longest road tunnel, is now under the control of the state road agency 1410 Estradas de Portugal. Another investment of €150 million (US$ 202.91 million) is required to complete the major infrastructure works, earmarked for completion in eight to nine months. The finished structure will be part of the A4 motorway between Vila Real and Amarante.

For more information on companies in this article

Related Content

  • Landmark bridge for Italy?
    August 9, 2023
    The news that the Italian Government is once again considering building a bridge spanning the Messina Strait is of major significance for the construction sector, as well as for the country.
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • Work commencing on key New Zealand tunnel link
    August 3, 2012
    New Zealand prime minister John Key led an official ground-breaking ceremony this week to allow the start of excavation work for two new 2.4km-long motorway tunnels beneath suburban Auckland. The Waterview Connection project is on schedule to begin its main construction phase next year, and the prime minister was on hand to turn the first soil for a 30m-deep trench which is needed to allow access for the tunnels’ southern approach trench in the west Auckland suburb of Owairaka.