Skip to main content

Many bidders for key Polish dual carriageway works

Great interest has been shown in tenders advertised by GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.
October 15, 2013 Read time: 1 min
Great interest has been shown in tenders advertised by 1361 GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.

For more information on companies in this article

Related Content

  • $3 billion dual carriageway planned for Taiwan
    April 1, 2025
    A $3 billion dual carriageway route is planned for Taiwan
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Polish project hits rocky road
    March 5, 2012
    The project to build a section of the A4 highway in Poland between Brzesko and Wierzchoslawice in the South of the country looks set to hit major legal issues.
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru