Skip to main content

Many bidders for key Polish dual carriageway works

Great interest has been shown in tenders advertised by GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.
October 15, 2013 Read time: 1 min
Great interest has been shown in tenders advertised by 1361 GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.

For more information on companies in this article

Related Content

  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • Colombia’s Toyo Tunnel project providing key link
    May 20, 2016
    Colombia’s Toyo Tunnel project will provide an important new link for the country, writes Mauro Nogarin. The new Toyo Tunnel project is of immense importance for Colombia, improving transportation and providing an important road link. The work is being carried out by the Antioquia to the Sea Consortium, which comprises of FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. These firms are building the Toyo Tunnel project and the various access roads, with the
  • EIB lends €900mn for Poland’s S7 and S8 dual carriageways
    December 14, 2012
    Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
  • Polish bridge construction project underway
    September 30, 2019
    Construction work is underway for a new bridge forming part of the S3 expressway in Poland. The second bridge at Cigacice is close to completion and is in the Lubuskie Voivodeship, Poland. The S3 route represents a major construction project for Poland with work ongoing for the stretch connecting Sulechów and Nowa Sól. This section includes building a new bridge spanning the Odra River at Cigacice is being built. This bridge is built from either side of the river and now is almost connected and is expected