Skip to main content

Malaysia highways being built

Construction work for three new highways will commence in Malaysia’s Penang State by June 2016. The work will help reduce congestion in Penang State. The first of the three highways to be built will be the Air Itam-Tun Dr Lim Chong Eu Expressway bypass. This project is being carried out by Malaysia-based Consortium Zenith BUCG. Meanwhile plans are also in hand to construct the Setiawangsa-Pantai Expressway (SPE) in Malaysia. The project is expected to cost US$845.6 million. The SPE link should be open to t
January 13, 2016 Read time: 1 min
Construction work for three new highways will commence in Malaysia’s Penang State by June 2016. The work will help reduce congestion in Penang State. The first of the three highways to be built will be the Air Itam-Tun Dr Lim Chong Eu Expressway bypass. This project is being carried out by Malaysia-based Consortium Zenith BUCG.

Meanwhile plans are also in hand to construct the Setiawangsa-Pantai Expressway (SPE) in Malaysia. The project is expected to cost US$845.6 million. The SPE link should be open to traffic in 2020 and the route will be the first in the country to feature sophisticated electronic, multi-lane, free-flow tolling technology. The project is being carried out as a concession package for the expressway's design, construction, completion, management, operation and maintenance. The concession period is for 53 years and six months.

Related Content

  • Nairobi Expressway construction ahead of schedule
    October 13, 2021
    The Nairobi Expressway construction project is ahead of schedule.
  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • New Malaysian highway to cut congestion
    April 22, 2014
    The new Kinrara-Damansara Skyway (Kidex) being planned for Malaysia is expected to help reduce traffic congestion. A study carried out by SKM-CB Colin Buchanan-Sinclair Knight Merz in 2011 indicated that the highway will be able to lower travelling time between Damansara and Kinrara by 25%. Meanwhile the volume of traffic in both directions from Puchong to Petaling Jaya will be lessened by 50%. From Taman Tun Dr Ismail, from Bandar Utama to Petaling Jaya and from the New Klang Valley Expressway (NKVE), traf
  • New highway projects planned for Malaysia
    December 13, 2013
    Major highway projects are being planned for Malaysia, to boost transport connectivity. A new toll road has been proposed in Negri Sembilan's Senawang, to connect the Kajang-Seremban Expressway (Lekas) with the North South Expressway (NSE). This has been put forward by the North South Expressway (NSE) operator, PLUS Expressway. The planned toll road would be shorter than the Lekas-NSE stretch by some 3-5km and would cut journey times by bypassing 11 traffic lights between Lekas and the NSE. The aim of the p