Skip to main content

Louis Berger wins key India bridge deal

Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish
January 10, 2018 Read time: 2 mins
The new VBSL link in India will speed transport in Maharashtra State

8657 Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete.

“We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish Nadgauda, Louis Berger senior vice president and managing director for Asia. “Our responsibilities on this significant project will require efficient delivery of top-quality, highly responsive services, and our intent is to exceed the MSRDC’s expectations in every respect.”

The VBSL, a northward extension of the existing Bandra-Worli Sea Link running along the western coast of the island of Mumbai, will be an eight-lane highway, approximately 10km in length. It will connect the western suburbs of Versova and Bandra. The main sea link will include a cable-stayed bridge section and a balanced-cantilever section for navigational purposes. It will also include two intermediate connectors, which will connect the sea link to the mainland and serve areas between Versova and Bandra, including Juhu and Koliwada. The sea link will help reduce traffic congestion in Mumbai.

 Louis Berger will provide services in three phases. The first phase will include the peer review of the previously-compiled techno-economic feasibility study and detailed project report (DPR). The second phase will include compilation of tender documents for engineering, procurement and construction (EPC) of the project, as well as management of the bid process. The third and last phase will involve project and construction management services during the construction and defects liability periods, including review of the selected EPC contractor’s engineering designs. The project is slated for completion by late 2021.

“We’re immensely proud to be selected for one of the largest sea link projects and look forward to working closely with the Maharashtra State Road Development Corporation throughout the duration of the project to ensure successful delivery on schedule and within budget,” said Amol Rodrigues, Louis Berger’s business development director for South Asia.

For more information on companies in this article

Related Content

  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around
  • Mumbai’s new coastal transport link
    July 6, 2022
    Mumbai’s new coastal road presents an ambitious and challenging project that will help improve the lives of the city’s inhabitants - Mike Woof writes
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • New bridge in Colombia using materials from CEMEX
    March 7, 2018
    A new bridge project in Colombia is benefiting from the supply of concrete from CEMEX Latam Holdings The project is to build a new bridge for Colombia’s Río Magdalena 2 Highway, with the road being one of the primary infrastructure projects currently under development in the country. CEMEX Colombia is supplying concrete for several essential elements of the project, including a viaduct over the Magdalena River that will become one of the longest bridges in the country.