Skip to main content

Louis Berger wins key India bridge deal

Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish
January 10, 2018 Read time: 2 mins
The new VBSL link in India will speed transport in Maharashtra State

8657 Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete.

“We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish Nadgauda, Louis Berger senior vice president and managing director for Asia. “Our responsibilities on this significant project will require efficient delivery of top-quality, highly responsive services, and our intent is to exceed the MSRDC’s expectations in every respect.”

The VBSL, a northward extension of the existing Bandra-Worli Sea Link running along the western coast of the island of Mumbai, will be an eight-lane highway, approximately 10km in length. It will connect the western suburbs of Versova and Bandra. The main sea link will include a cable-stayed bridge section and a balanced-cantilever section for navigational purposes. It will also include two intermediate connectors, which will connect the sea link to the mainland and serve areas between Versova and Bandra, including Juhu and Koliwada. The sea link will help reduce traffic congestion in Mumbai.

 Louis Berger will provide services in three phases. The first phase will include the peer review of the previously-compiled techno-economic feasibility study and detailed project report (DPR). The second phase will include compilation of tender documents for engineering, procurement and construction (EPC) of the project, as well as management of the bid process. The third and last phase will involve project and construction management services during the construction and defects liability periods, including review of the selected EPC contractor’s engineering designs. The project is slated for completion by late 2021.

“We’re immensely proud to be selected for one of the largest sea link projects and look forward to working closely with the Maharashtra State Road Development Corporation throughout the duration of the project to ensure successful delivery on schedule and within budget,” said Amol Rodrigues, Louis Berger’s business development director for South Asia.

For more information on companies in this article

Related Content

  • Building Tomorrow’s Transport Infrastructure Today – IRF Global in Washington
    May 2, 2018
    Preparations are underway for the world’s leading road, tunnel and bridge exhibition Produced by the International Road Federation, the IRF Global Road2Tunnel Expo & Conference is the only international conference and tradeshow of its kind dedicated to road, tunnel and bridge construction. “Technology and innovations are evolving at a pace never seen before in the history of the road and transport sector” noted IRF president & CEO C Patrick Sankey. “From innovations in materials, such as self-healing con
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Ferry operators sink the financing plan for Fehmarn Belt link
    December 17, 2018
    The Court of Justice of the European Union has said Denmark’s state grant aid to the proposed Fehmarn Belt link is illegal under EU rules. The court noted that the European Commission approved the Fehmarn project’s financing – total cost likely around the €8.7 billion - in July 2015 without a formal procedure. Denmark is completely responsible for financing the project that will replace a ferry service. Part of the funds were to come through the European Union and its Connecting Europe Facility for tr