Skip to main content

Lativa shuts down Riga’s Deglava Bridge amid safety concerns

Latvia’s interior affairs minister Sandis Ģirģens has ordered the closure of Deglava Bridge from today, 25 April, declaring is a safety risk. “I believe there are enough factors to conclude this bridge puts people’s lives at risk,” said Ģirģens, as reported by national media. If the city doesn’t close the bridge today, Ģirģens said the national State Police will. Latvia's State Construction Control Bureau last week ordered the closure of the bridge after inspectors found that the bridge's supportin
April 23, 2019 Read time: 2 mins

Latvia’s interior affairs minister Sandis Ģirģens has ordered the closure of Deglava Bridge from today, 25 April, declaring is a safety risk.

“I believe there are enough factors to conclude this bridge puts people’s lives at risk,” said Ģirģens, as reported by national media.

If the city doesn’t close the bridge today, Ģirģens said the national State Police will.

Latvia's State Construction Control Bureau last week ordered the closure of the bridge after inspectors found that the bridge's supporting structures were damaged. The reconstruction project does not include works to repair the damages in full, according to the media.

The bureau has been putting pressure on the city council to explain why the bridge had not previously been closed due to what they said were safety issues.

The city, however, has reduce the vehicle weight limit to 30 tonnes on the four-lane overpass.

Related Content

  • Alberta’s peaceful partnership
    May 4, 2020
    A bridge project in northern Canada threw up some unexpected challenges, reports David Arminas, from the banks of the Peace River in Alberta
  • Futureproofing UK construction equipment resilience
    May 5, 2021
    Rob Oliver is the longstanding CEO of the Construction Equipment Association (CEA), the UK trade association for the UK construction equipment industry. Guy Woodford recently caught up with him to discuss the industry’s health and the key issues facing the CEA and its members in 2021 and beyond.
  • Montreal’s new Champlain Bridge is in a race against time
    June 8, 2018
    Montreal’s US$3.24 billion Champlain Bridge across the St Lawrence River may not be open on time, according to a report by the independent Auditor General. The 3.4km cable-stayed bridge has two decks supporting three lanes of highway traffic in each direction. A third, central deck supports a mass transit system and a multi-use path. The new bridge will replace the nearby 50-year-old Champlain Bridge which has been deteriorating at an alarming rate. The government signed a contract in 2015 with a private
  • Iterchimica trials more Gipave in Oxfordshire
    November 23, 2023
    Another trial of Iterchimica’s graphene-enhanced Gipave technology gets underway in the English county of of Oxfordshire.