Skip to main content

La Linea Tunnel project recommences

Construction work on Colombia’s La Linea Tunnel project has recommenced.
By MJ Woof April 17, 2020 Read time: 1 min
Construction work has recommenced on Colombia’s La Linea Tunnel project - image © courtesy of Wollertz, Dreamstime.com

Construction work for Colombia’s Tunel de la Linea project has recommenced. The national road institute (Invias) has said that strict biosecurity protocols are now in place in response to coronavirus to maximise safety for personnel.

At present engineers are installing the electromechanical equipment for the tunnel and this portion of the project is 60% complete. The tunnel had been due for completion on 29th May 2020. However its opening is being delayed once more.

The Tunel de la Linea (La Linea Tunnel) project has been delayed several times and due to a number of reasons.

Once the tunnel is complete, it will provide an important transport link. It will replace a treacherous mountain pass, noted for a number of sharp curves that has poor safety and particularly in bad weather.

Related Content

  • Tunnel for Colombia’s Calarca – Cajamarca Highway
    May 23, 2014
    A new tunnel is forming an important link for a major Colombian highway - Mauro Nogarin reports Work on a major highway project is underway in Colombia, forming part of the Bogota-Buenaventura Corridor. The highway has a length of 503km and is located in central Colombia, connecting the departments of Tolima and Quindio, across the central Andes, with a total cost of around US$330 million. A key section of the project consists of building a unidirectional tunnel of approximately 8.65km in length. Anot
  • Colombia’s La Linea tunnel seeing funding solution?
    October 22, 2014
    The Colombian Government is keen to retart work on the important La Linea Tunnel link. The project has been delayed for a number of reasons and on a number of occasions since it was first envisaged. Engineering firm Valores y Contratos (Valorcon) has now been suggested as a likely candidate to become a strategic partner to join the Union Temporal Segundo Centenario joint venture that will carry out the La Linea tunnel scheme. Valorcon would provide sufficient cash flow US$68 million, either directly or thro
  • Colombia’s La Linea Tunnel link opening
    September 1, 2020
    Colombia’s La Linea Tunnel link is opening to traffic.
  • Cost rises again for Columbia’s unfinished La Linea tunnel
    February 3, 2015
    Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B