Skip to main content

Kier rebuilds storm-damaged road in England’s tourist Cumbria region

The first of 20 steel posts have been positioned for major road repairs to the A591 road in northern England under a £40 million project to repair December storm damage. The A591 is a major local authority road in Cumbria. It links the M6 motorway near Brettargh Holt with important Lake District tourist destinations such as Kendal, Windermere, Ambleside, Grasmere and Keswick.
May 10, 2016 Read time: 2 mins
Improvements are being made to the A591 in Cumbria

The first of 20 steel posts have been positioned for major road repairs to the A591 road in northern England under a £40 million project to repair December storm damage.

The A591 is a major local authority road in Cumbria. It links the M6 motorway near Brettargh Holt with important Lake District tourist destinations such as Kendal, Windermere, Ambleside, Grasmere and Keswick.

The restoration project is being led by 8100 Highways England, the wholly government-owned road infrastructure agency, on behalf of Cumbria County Council and the road is schedule to be reopened by the end of May.

Last month, Kier Highways was appointed as main contractor for the re-build work on the A591 at Dunmail Raise, which was washed away. Posts are being fastened to the bedrock at the site and will be used to build a retaining wall in the beck at the side of the collapsed part of the A591.
 
Chris Holehouse, Highways England’s senior project manager for the scheme, said that the retaining wall is already starting to take shape. It wall will provide greater protection to the road from the effects of erosion.

The wall will be built using 4.5m-wide concrete panels which will be supported by the steel posts. More concrete will be poured behind the panels up to a thickness of 3.5m. The wall will also be covered with local stone so that it looks like a dry stone wall and blends in with the local landscape.
 
So far, Kier has removed all the loose rocks and stones from the edge of the beck, created strong foundations for the concrete wall panels and installed some of the steel supporting posts.

For more information on companies in this article

Related Content

  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • UK’s M3 motorway gets first orange smart motorway emergency area
    July 19, 2017
    The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England’s county Surrey. The redesigned emergency area has a highly visible orange road surface and better signs to help improve its visibility make it more obvious to drivers on smart motorways, according to Highways England.
  • R&W takes in-house the recycling of dry and wet waste
    January 15, 2016
    With the introduction of EU regulations in 2012 controlling the disposal of dry and wet waste from road sweepings and gully waste and it is not acceptable to send this material to landfill. Many local authorities have had to find an alternative solution. R&W Civil Engineering in the southern UK country of Hampshire, is a specialist in highway construction, maintenance and other transport related services. It, along with other contractors started transporting waste material to the nearest processing stati