Skip to main content

Key tunnel upgrade for Austrian network

Austria’s Arlberg Tunnel is now on track for its planned upgrade. The work will focus on improving safety, in line with European requirements. The twin tube tunnel will benefit from new emergency exists and areas in which broken down vehicles can be parked, as well as sophisticated heat detection technology to provide alerts for vehicle fires and spraying systems. In all the upgrade work is likely to cost some €136 million. The work will be carried out by the PKE-Jäger-BEMO-Hinteregger partnership.
June 9, 2014 Read time: 1 min
Austria’s Arlberg Tunnel is now on track for its planned upgrade. The work will focus on improving safety, in line with European requirements. The twin tube tunnel will benefit from new emergency exists and areas in which broken down vehicles can be parked, as well as sophisticated heat detection technology to provide alerts for vehicle fires and spraying systems. In all the upgrade work is likely to cost some €136 million. The work will be carried out by the 4799 PKE-Jäger-BEMO-Hinteregger partnership.

For more information on companies in this article

Related Content

  • Innovative new US style paver from Atlas Copco
    October 9, 2015
    Atlas Copco Dynapac has upgraded its US style F800T paver. This highway class machine is aimed at the 3.05m wide market. Power comes from a six-cylinder Cummins diesel that meets the Tier 4 Final emissions requirements. The machine has a 34kW onboard generator which is sufficient to power the electrically heated screed, as well as extra lighting for night working and other equipment.
  • New US pavers coming to market
    July 7, 2022
    New US asphalt pavers are now coming to market
  • US$12.2 billion for new Indian tunnels
    September 18, 2024
    A US$12.2 billion budget is being invested in new Indian tunnel projects.
  • Swiss tunnel options
    June 19, 2012
    Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other option is likely to cost €752 million and will see the work carried out in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the higher volumes o