Skip to main content

Key Florida highway link wins major award

A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the
July 2, 2014 Read time: 2 mins
A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the 2697 Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer 3005 Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the link, this traffic has been moved from the streets of the nearby Ybor City, cutting congestion and increasing safety.

The Connector is a four-level, elevated, directional interchange made up of a complex network of 30 bridges. It features a self-contained, overhead, all-electronic toll collection system that can be maintained and repaired without disrupting traffic flow. The steel toll gantries are constructed of two Vierendeel-type trusses that each span 47.24m. Atkins served as lead project engineer and as primary designer of the Connector’s southern portion, which comprised 80% of the overall project. Atkins provided a wide range of professional services, including roadway, bridge, and drainage design; surveying; architecture; landscape design. The project was funded primarily by FDOT, Florida’s Turnpike enterprise, and the 1088 American Recovery and Reinvestment Act of 2009. L Joe Boyer, Atkins CEO, North America, said, “This was the largest construction contract that FDOT District 7 has advertised for bidding, and one of the largest projects ever designed in North America by Atkins.

Tom Barry, PE, director of Atkins’ DOT business unit, added, “This is a project of tremendous importance to the Tampa area, and it’s wonderful to see it get the recognition it deserves. Ten Atkins offices worked together with 30 specialty subconsultants, investing more than 500,000 hours preparing the necessary plans, specifications, and estimates under an aggressive, 36-month design schedule.”

For more information on companies in this article

Related Content

  • Florida and one.network in lane closure pilot
    August 30, 2022
    The project will use Live Link, one.network's proprietary shared road management platform that connects with major GPS providers in the US.
  • Texas route benefits from loan
    March 1, 2012
    Drivers in Texas using the SH161 route are set to benefit from a US$418 million loan being provided by the US Department of Transportation to complete work on the link.
  • Parsons wins award for Caldecott Tunnel
    November 8, 2013
    Parsons has won an award for its work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway proje
  • How Florida paved the way for availability payments in the US
    November 21, 2014
    New financing models have been used to deliver key transport links in the US - * Patrick D Harder and Brandon J Davis Florida Department of Transportation’s (FDOT) public-private partnership (PPP) programme has made impressive progress, setting precedents for US transportation planning and funding. On March 26th 2014, FDOT opened 16km of new reversible express lanes as part of its US$1.8 billion I-595 Corridor Roadway Improvements Project. Just a few months later, on August 3rd 2014, FDOT opened twin tunnel