Skip to main content

Key Colombia connection construction contract

Construction work on a new road link connecting Mulalo with Loboguerrero in Colombia will commence in the third quarter of 2018. The 31km link is being handled by Colombia's National Infrastructure Agency (ANI) and is expected to cost US$560.5 million. The plans are being drawn up for the project while the necessary environmental permits are being sought from Colombia’s National Environmental Licensing Agency (ANLA). The new link will be located in Colombia’s Valle del Cauca department.
January 17, 2018 Read time: 1 min
Construction work on a new road link connecting Mulalo with Loboguerrero in Colombia will commence in the third quarter of 2018. The 31km link is being handled by Colombia's National Infrastructure Agency (ANI) and is expected to cost US$560.5 million. The plans are being drawn up for the project while the necessary environmental permits are being sought from Colombia’s National Environmental Licensing Agency (ANLA). The new link will be located in Colombia’s Valle del Cauca department.

Related Content

  • Colombia highway plans announced
    June 4, 2020
    Key Colombian highway plans are being announced.
  • ANI transfers operation of Guillermo Gaviria Correa to Mar 1 Devimar
    July 6, 2016
    The Colombian department of Antioquia has transferred operation of the Guillermo Gaviria Correa road connection to the National Infrastructure Agency (ANI). ANI will, in turn, cede the concession to the Mar 1 Devimar consortium. The road, named after the assassinated governor of Antioquia, runs between the municipalities of Medellin and San Jerónimo and connects Medellin to the Uraba Gulf, part of the Caribbean Sea. Gaviria, a Nobel Peace Prize nominee, was kidnapped by guerrillas and held captive for
  • Colombia’s fourth generation road project tenders underway
    February 4, 2013
    The National Infrastructure Agency (ANI) in Colombia has opened a tender process for the first four out of 30 fourth generation road projects in the South American country. A total of US$24.75 billion (COP 44tn) is to be invested in the projects. The pre-qualified bidders will be known in around six weeks. The contracts will be awarded in September. The fourth generation road projects will be located in Costa Caribe, Valle del Cauca and Cundinamarca. They include the 164km Caqueza-La Calera-Sopo corridor, t
  • Colombia road project tender process
    July 22, 2019
    The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km