Skip to main content

Kazakhstan bridge project complete

The opening of a new bridge in Kazakhstan that spans the Irtysh River is now offering a shorter route for drivers. The link is 12.3km long and is now the longest such structure in Central Asia, while the project cost around US$157 million. Its length was necessary as the bridge crosses a floodplain area, with a channel that can widen considerably following periods of heavy rain. Located in the country’s Pavlodar region, the bridge cuts the route used previously by over 40km. The bridge is expected to carry
December 16, 2016 Read time: 2 mins
The opening of a new bridge in Kazakhstan that spans the Irtysh River is now offering a shorter route for drivers. The link is 12.3km long and is now the longest such structure in Central Asia, while the project cost around US$157 million. Its length was necessary as the bridge crosses a floodplain area, with a channel that can widen considerably following periods of heavy rain. Located in the country’s Pavlodar region, the bridge cuts the route used previously by over 40km. The bridge is expected to carry around 10,000 vehicles/day and will improve the country’s transport connections with Russia while also providing a key central section of the road route that runs all the way from China to Western Europe.

The structure rests on 1,146 bored piles and 66 bridge supports and is constructed from around 13,500tonnes of steel as well as 150,000m3 of concrete. The bridge project marks something of a step ahead for the country as it utilised modern construction techniques, such as the use of a heavy lifting process with cables and jacks to erect the central span.

Related Content

  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Arch of innovation
    September 21, 2020
    ULMA engineering solutions on the emblematic Arch of Innovation bridge, Brazil
  • Bridge drainage solution prevents water damage
    February 10, 2012
    Pipeline & Drainage Systems (PDS), is pointing to its EnviroDeck drainage product saying that unless properly drained, water can cause severe damage to bridges, particularly on deck surfaces where it may become trapped.
  • Auckland’s causeway project
    April 4, 2014
    When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.