Skip to main content

Kazakhstan bridge project complete

The opening of a new bridge in Kazakhstan that spans the Irtysh River is now offering a shorter route for drivers. The link is 12.3km long and is now the longest such structure in Central Asia, while the project cost around US$157 million. Its length was necessary as the bridge crosses a floodplain area, with a channel that can widen considerably following periods of heavy rain. Located in the country’s Pavlodar region, the bridge cuts the route used previously by over 40km. The bridge is expected to carry
December 16, 2016 Read time: 2 mins
The opening of a new bridge in Kazakhstan that spans the Irtysh River is now offering a shorter route for drivers. The link is 12.3km long and is now the longest such structure in Central Asia, while the project cost around US$157 million. Its length was necessary as the bridge crosses a floodplain area, with a channel that can widen considerably following periods of heavy rain. Located in the country’s Pavlodar region, the bridge cuts the route used previously by over 40km. The bridge is expected to carry around 10,000 vehicles/day and will improve the country’s transport connections with Russia while also providing a key central section of the road route that runs all the way from China to Western Europe.

The structure rests on 1,146 bored piles and 66 bridge supports and is constructed from around 13,500tonnes of steel as well as 150,000m3 of concrete. The bridge project marks something of a step ahead for the country as it utilised modern construction techniques, such as the use of a heavy lifting process with cables and jacks to erect the central span.

Related Content

  • Rebuild project for historic Pennsylvania bridge
    September 10, 2015
    Rebuilding work is planned for a historic bridge in the US state of Pennsylvania to ensure it remains able to carry current traffic volumes. The work is being managed by consulting engineer Michael Baker International. Pennsylvania Department of Transportation (PennDOT) selected Michael Baker International for the US$5 million engineering and design project that will focus on the western spans of the Market Street Bridge in Harrisburg. Rehabilitating this critical traffic artery in Pennsylvania's capital re
  • VST used on Portuguese bridge
    February 17, 2012
    PERI says that its new VST heavy-duty shoring tower serves as load-bearing scaffold for the large bridge and civil engineering projects. Each leg on the VST (VARIOKIT Shoring Tower) system can carry a load of around 600kN (the weight of about 60 VW Golf cars or one Leopard-2 tank), and the extremely flexible modular system can be assembled as segmental sections, towers or shoring tower frames for heights up to 40m.
  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km
  • Rural Czech roads get paving upgrade
    November 2, 2012
    A series of rural road rebuilds have improved transport connections in the Czech Republic, helping to boost connectivity and the local economy The roads around Brandýs nad Labem, some 25km to the southwest of Czech capital Prague are crucial arteries to the rural and agricultural areas of the country. An assessment by regional authorities indicated that these roads are in need of repair. That led to cold planing and paving work on a series of rural roads near Brandýs nad Labem. The regional authorities had